skip navigation
News & Events

Construction Noise

Date: 08/25/2009
Construction Noise The University will install tunnels in the vicinity of the Library from 8/26/2009 to 5/14/2010. During this period there may be loud construction noise in the basement and lower floors of the Library. Work hours are 7:00 am to 5:00 pm, Monday through Friday The tunnels will form a "campus loop" that will result in considerable energy, operational, and maintenance savings by consolidating boilers and chillers in central plants, and replacing equipment that is well beyond its useful life. It is an important step to making PSU a sustainable and efficient campus. We apologize for the inconvenience

Portland State University | 503.725.5874 | Maps & Directions | Contact Us | Accessibility | Support the Library | Sitemap |